Construction of Units 3 and 4 at Khmelnytska Nuclear Power Plant: The Role of the Parliament of Ukraine / Policy paper (2012)

This policy paper was prepared in response to the adoption of the Law of Ukraine No 5217-VI “On the Design and Construction of the Units 3 and 4 at Khmelnytska Nuclear Power Plant”. Joint publication with National Environmental Center of Ukraine and Ecoclub (Rivne). In Ukrainian, English summary only. 

Download document
Download
Share this document
Twitter Facebook